The Bunker Hill Superfund Site spans northern Idaho and eastern Washington in an area known as the Silver Valley. Mining and milling operations started in the mid to early 1880s, which resulted in heavy metal contamination throughout the area.
Lead and other heavy metals can pose a risk to people’s health particularly to young children and pregnant women. As a result of this human health concern, the US Environmental Protection Agency (EPA) added this site to the National Priorities List in 1983. Although cleanup efforts have reduced exposures to susceptible populations over the last 30 years, the nature of the cleanup requires ongoing local oversight to ensure completed remedies are protected and additional cleanup activities continue as communities grow and land use changes.
Our Kellogg Superfund Project Office serves as a local resource and is available to assist with questions and issues regarding the cleanup.
This accordion will not appear on the screen

Superfund cleanup decisions are made by EPA and written into records of decision (ROD). A ROD is a legal public document issued by EPA outlining the cleanup that will take place at a Superfund site. EPA is the lead agency for the Bunker Hill Superfund Site.
Environmental cleanup has been underway since the 1980s through coordinated efforts between federal, state, tribal, industrial, and local community groups. This work has resulted in significant progress:
- Remediating approximately 7,000 residential yards, parks, commercial properties, and other public areas.
- Rehabilitating mine and mill sites, railroad rights of way, recreation areas, and affected drinking water.
- Operating an institutional controls program to ensure that clean soil and other protective barriers over contaminants are left in place to keep remediated properties clean.
- Providing free blood lead screening to residents living within the Bunker Hill Superfund Site as a public health service by Panhandle Health District.
- Offering public health education and project outreach.
DEQ is a partner agency with EPA and Panhandle Health District to implement the cleanup and take into consideration local concerns and the State’s goals and priorities. DEQ’s Kellogg office serves this community and assists the public, property owners, and local governments.
Annual project plans, reports, and updates are brought to the community through the Basin Environmental Improvement Project Commission (BEIPC), a commission of three counties, two states, the federal government, and the Coeur d’Alene Tribe.
Contaminated soil generated by property remediation, homeowner projects, or business development is taken to nearby repositories. Repositories help keep the public safe by centralizing contaminated material in a controlled location.
Repository designs are tailored to site needs and require monitoring wells, stormwater controls, and soil compaction as a part of a protective design. All are regularly monitored to ensure public and ecological safety.
For additional information, contact DEQ’s Kellogg Satellite Office.
In 2021, DEQ will assume responsibility for operating the newly upgraded central treatment plant at the Bunker Hill Superfund Site. The plant will remove metals in mine water discharged from the Bunker Hill Mine and contaminated ground water beneath the historic Bunker Hill central tailings impoundment.
The new system will treat up to 5,000 gallons of contaminated water per minute. The completed treatment plant and ground water collection system are expected to capture nearly 30% of the total dissolved zinc loading in the Upper Basin and provide a significant water quality improvement to the South Fork Coeur d’Alene River.
DEQ continues to work closely with EPA, the Army Corps of Engineers, and contractors during the construction of the project. Federal contractors will continue to operate the system for 1 year after construction is complete to demonstrate successful operations and provide training to DEQ staff and contractors.
Long-term funding for the future operations of the plant was provided through an endowment created under a 2011 consent decree (United States of America v. Hecla Mining Company and Consolidated Cases, No. 96-01220N-EJL, No. 91-0342-N-EJL, and No. 94-0206-N-HLR).
In 2014, the Bunker Hill Water Treatment Endowment was established with a deposit of $52.3 million. These settlement funds are managed by the Idaho Endowment Fund Investment Board through a memorandum of agreement among EPA, the Coeur d’Alene Tribe, and DEQ.
Annual operations are expected to cost approximately two million dollars. From 2021 to 2024, DEQ will procure contractors to support operations of the new system, develop staff expertise to oversee the plant, and optimize the operations of the new system. The operations data from the first years of running the new system will be used to evaluate future contracting alternatives to make the most efficient use resources to ensure the sustainability of the operations funding.