May 29, 2025
The Idaho Department of Environmental Quality (DEQ) released modified Idaho Pollutant Discharge Elimination System (IPDES) preliminary draft permits to the Hayden Area Regional Sewer Board and the cities of Post Falls and Coeur d’Alene for preliminary review.
September 22, 2022
The Idaho Department of Environmental Quality (DEQ) is releasing an Idaho Pollutant Discharge Elimination System (IPDES) preliminary draft permit to the Albeni Falls Dam for preliminary review.
November 17, 2022
BOISE — The Idaho Department of Environmental Quality (DEQ) is advancing three water quality improvement plans—known as total maximum daily loads—designed to control pollutants in the Beaver-Camas subbasin, Lower Clark Fork River, and Spokane River.
BOISE — The Idaho Department of Environmental Quality (DEQ) today announced the award of a $1.65 million low-interest drinking water construction loan to the city of Priest River in Bonner County.