This action would authorize Glen and Bernadine Tabor to protect several building structures by constructing re-slope banks, adding willow plantings, and reintroducing cottonwood trees to sections of the Snake River. 

Based on its review of the joint application for permit, DEQ certifies that if the permittee complies with the terms and conditions imposed by the permit along with the conditions set forth in this water quality certification, then there is reasonable assurance the activity will comply with the applicable requirements of the Clean Water Act, the Idaho water quality standards, and other appropriate water quality requirements of state law. (ACOE Permit Application Number: NWW-2019-142-IO2)

Public Comment Form

Fields marked with * are required.

Staff Contacts

Water Quality Analyst
Greg Mladenka
DEQ Pocatello Regional Office
444 Hospital Way #300
Pocatello, ID 83201
(208) 236-6160
greg.mladenka@deq.idaho.gov

Related Documents