Permitting Program Overview
(formerly known as Land Application Permitting Program)
| |
| |
| Wastewater
consists of spent or used water from a home, community, farm, or
industry that contains dissolved or suspended matter.
Land application of wastewater is one method of reusing treated wastewater. It is a natural way of recycling by which wastewater is applied
to land for irrigation and is absorbed by the crop or assimilated
into the soil structure. Reuse is the broader topic of which land application is but one method. Other methods of reuse include commercial toilet flushing, dust control, and fire suppression.
|
| |
| Background |
| Wastewater
may contain any of a number of types of chemicals and, in some cases,
human pathogens. To protect public health and prevent pollution
of surface and ground waters, Idaho's Wastewater Reuse Permit Rules (IDAPA 58.01.17) (pdf
on Department of Administration Web site) require anyone
wishing to land-apply or otherwise use wastewater to obtain a wastewater reuse
permit before constructing, modifying, or operating a wastewater reuse facility in the state. (The rules do not apply to feedlots,
dairies, and mining.)
DEQ is the state agency assigned responsibility by the Idaho Legislature
to issue wastewater reuse permits in the state. Two types of wastewater reuse permits are issued—industrial
and municipal. Industrial wastewater reuse permits regulate reuse of wastewater
from such operations as food processing facilities. Municipal wastewater reuse permits regulate reuse of wastewater
that contains treated sewage. All wastewater reuse permits specify both standard and
site-specific conditions. Additional requirements apply to municipal
wastewater reuse permits. |
| |
| Standard Permit Conditions |
All
wastewater reuse permits require permittees to properly maintain and operate their
treatment, control, and monitoring equipment; respond to DEQ's requests
for relevant information; provide access to the permitted facility
to inspect equipment, operations, and records and to monitor compliance;
and report information pertaining to planned physical or operational
changes and noncompliance episodes. Failure to comply may result
in civil penalties and revocation of the permit. Wastewater reuse permits are issued
for terms of five years, after which the permittee is responsible
for applying for a new permit to continue operation. |
| |
Odor
Management |
| Because
odors may be of concern to neighbors of wastewater treatment plants,
reuse facilities, and other operations associated with
these facilities, all wastewater reuse permits prohibit these facilities from creating
a public health hazard or nuisance conditions including odors. Permittees
are required to develop nuisance odor management plans outlining
specific design considerations, operation and maintenance procedures,
and management practices that will be employed to minimize the potential
for or limit odors. Plans also must include procedures for responding
to odor incidents and notifying the public if an incident occurs. |
| |
| Specific Permit Conditions |
| Because
of varying environmental conditions and wastewater compositions,
wastewater reuse permits also prescribe specific permit conditions based on the characteristics
of the wastewater to be reused, the geology and climate at the
facility site, the size of the facility and its proximity to populated
areas and to ground and surface water, techniques that may be used
to distribute the wastewater, abilities of the soils and vegetative
covers to treat the wastewater, or other conditions relevant to the type of reuse involved.
Specific
permit conditions differ from facility to facility and may specify
or limit wastewater composition; the method, manner, and frequency
of wastewater reuse; wastewater pretreatment requirements; and
the physical, chemical, and biological characteristics of the wastewater.
Varying compliance schedules as well as monitoring and reporting
requirements may be imposed as well. |
| |
| Municipal Wastewater Requirements
|
Municipal
wastewater is often used to irrigate farmlands, orchards and vineyards,
golf courses, cemeteries, parks, playgrounds, schoolyards, and other
areas. Because of the nature of this wastewater and its potential
exposure to humans and animals, certain specific treatment requirements
apply to municipal wastewater reuse. For example, monitoring
requirements include mandatory bacterial sampling. Other specific
measurable criteria also must be met, depending on whether the municipal
wastewater may come into contact with edible or inedible portions
of raw food crops, fruit, fodder, seed, and processed food crops.
Irrigation may be allowed only during periods of non-use, and public
access may be restricted.
|
| |
| Application and Processing Procedures |
| The
wastewater reuse permit application process begins with submittal of a web-based pre-application form to DEQ and scheduling of a pre-application conference
at which prospective applicants meet with DEQ to discuss application
requirements. Applicants are then required to submit to DEQ an application
including site-specific information, facility and topographic maps,
and wastewater-specific information.
Upon
receipt of the application, DEQ reviews the applicant's information
and, if all requirements have been met, issues a completeness determination within 30 days. If the application is determined to be complete, the Department will then set the effective date of the application. Within 30 days following the effective date of the application, DEQ will issue a preliminary decision to prepare a draft permit or deny the application. Following a decision to prepare a draft permit, DEQ will prepare the draft permit within 60 days. The public is then notified that a draft permit
has been issued and is given an opportunity to comment. The effective
date of the final permit is generally 60 days after the draft permit
has been issued.
Link to Final
Wastewater Reuse Permits Issued by DEQ.
Link to Draft
Wastewater Reuse Permits Open for Public Comment.
Link to Preapplication Form. |
| |
|
 |