Department of Environmental Quality HomeSearchFeedbackContact UsAccess Idaho
skip nav
About Us
Public Info & Input
Air
Water
Waste
INL Oversight
Maps & Data
Rules & Regs



Sign up for email updates Sign up
for E-mail Updates

Return to

Current DEQ Rulemaking Activity

See Also

Administrative Rules Process Overview

DEQ's Codified Rule Chapters

On Department of Administration Web site

DEQ Administrative Rules Coordinator

Paula Wilson

DEQ State Office

1410 N. Hilton

Boise, Idaho 83706

ph: (208) 373-0418

fx: (208) 373-0481

paula.wilson@deq.idaho.gov

 

DEQ Rulemaking: Public Drinking Water Systems

58-0108-0801, Negotiated Rulemaking

 
 Revision and Clarification of Facility and Design Standards

 Overview

Under the provisions of IDAPA 58.01.08, Idaho Rules for Public Drinking Water Systems, a water main extension, whether approved for construction by the Department of Environmental Quality (DEQ) or by a qualified licensed professional engineer (QLPE), is a material modification to the public water system. The current rules define a simple water main extension as an extension that can be supplied without adding pumping capacity.  The current rules also specify that all portions of the existing system that are affected by the line extension must be in compliance with the rules in effect at the time the project is reviewed and approved.  This requirement could in some cases require upgrades to existing parts of the water system to meet criteria for pumping redundancy, standby power, fire flow, and other applicable rule requirements such as completion of a facility plan.

The objective of this rulemaking is to modify the recently updated Idaho Rules for Public Drinking Water Systems so that the engineering community can approve simple water main extensions as intended by 2005 SB 1220 and as codified at Idaho Code § 39-118. 

The preliminary draft rule will include the following proposed revisions:

  1. Modify the content of facility plans and preliminary engineering reports contained in Sections 502 and 503, respectively;
  2. Clarify separation requirements for sources of contamination from public drinking water wells (Sections 510, 512, and 900);
  3. Add and clarify design requirements for drinking water distribution systems (Section 542);
  4. Further define storage structures and facilities (Section 544); and
  5. Clarify several operating criteria for public drinking water systems (Section 552).

This rulemaking will also include any necessary corrections that are typographical and nonsubstantive in nature (e.g., making corrections for consistency with other sections in this rule chapter, IDAPA 58.01.16, Wastewater Rules, and other DEQ rules).  These changes will be based on feedback from the regulated community and DEQ staff who routinely use the rules.

 

Drinking water system owners and operators, developers, consultants, engineers, cities, counties, industry, drinking water professional organizations, and the public at large may be interested in participating in this rulemaking.  Upon conclusion of negotiations, DEQ intends to publish a proposed rule for public comment in the summer of 2008 and then present the final proposal to the Board of Environmental Quality for adoption of a pending rule in the fall of 2008. If adopted, the pending rule will be reviewed by the 2009 Idaho Legislature.

 

 Draft Negotiated Rule

The preliminary draft rule can be obtained here in pdf format or by contacting Paula Wilson at paula.wilson@deq.idaho.gov, (208)373-0418.  Anyone may submit written comments during this negotiated rulemaking to Paula Wilson by e-mail or fax to 373-0481.  For information regarding submission of written comments on subsequent drafts of the negotiated rule, and to receive the most recent version of the draft negotiated rule, contact Paula Wilson.

 
Note: Documents are in pdf format.
Draft Negotiated Rule
Date Posted
Written Comment Deadline
Preliminary Draft (Draft No. 1)
04/03/08
04/24/08
Draft No. 2
05/01/08
05/09/08

Draft No. 3

Section 531 - Design Standards for

Chemical Application

05/15/08

05/19/08

05/22/08

05/22/08

Draft No. 4

05/28/08

06/10/08

Draft No. 5 (Final Draft)

06/16/08

The comment period for this

negotiated rulemaking has

concluded.  The comment

period on the proposed rule will

commence upon publication of

the proposed rule in the Idaho

Administrative Bulletin. DEQ

intends to publish the proposed

rule on August 6, 2008.

 

 Meeting Schedule

Those interested in participating in the negotiated rulemaking process are encouraged to attend the following meetings.  The meetings will take place simultaneously and will be connected by telephone.  Additional meetings may be scheduled if necessary. For information regarding additional meetings, contact Paula Wilson at paula.wilson@deq.idaho.gov, (208)373-0418.

 
Meeting Dates
Meeting Locations

April 22, 2008

9:30 a.m. - 12:30 p.m.

Mountain Time

DEQ

Conf. Rm. D

1410 N. Hilton

Boise, ID

DEQ

Large Conf. Rm.

900 N. Skyline, Suite B

Idaho Falls, ID

DEQ

Large Conf. Rm.

2110 Ironwood Pkwy.

Coeur d'Alene, ID

May 6, 2008

9:30 a.m. - 12:30 p.m.

Mountain Time

DEQ

Conf. Rm. D

1410 N. Hilton

Boise, ID

DEQ

Large Conf. Rm.

900 N. Skyline, Suite B

Idaho Falls, ID

DEQ

Large Conf. Rm.

2110 Ironwood Pkwy.

Coeur d'Alene, ID

May 20, 2008

9:30 a.m.

Mountain Time

The meeting will conclude when the group finalizes the discussion on the remaining issues.

DEQ

Conf. Rm. D

1410 N. Hilton

Boise, ID

DEQ

Large Conf. Rm.

900 N. Skyline, Suite B

Idaho Falls, ID

DEQ

Large Conf. Rm.

2110 Ironwood Pkwy.

Coeur d'Alene, ID

 

 Idaho Administrative Bulletin

adm.idaho.gov/adminrules/bulletin/mstrtoc.htm

Notice of Negotiated Rulemaking - April 2, 2008

 

 DEQ Contact

Michael Stambulis, (208) 373-0123 or michael.stambulis@deq.idaho.gov.



  Home | Search | Contact Us |Feedback | About PDF Files | Acronyms | Glossary | State of Idaho | Privacy Notice  
  Copyright © 2000-2008, Idaho Department of Environmental Quality. All rights reserved.