Draft 401 Certification - Nampa Paving Boise River Bank Stabilization Project

Accepting Comments from February 23, 2018 to March 16, 2018

This action would authorize Nampa Paving to place an angular riprap revetment and filter blanket along approximately 130 linear feet of bank on the Boise River. Three rock barb structures will also be installed below the ordinary high water mark. Willow bundle cuttings will be placed every 10-12 feet along the entire length of the proposed project.

Based on its review of the joint application for permit, DEQ certifies that if the permittee complies with the terms and conditions imposed by the permit along with the conditions set forth in this water quality certification, then there is reasonable assurance the activity will comply with the applicable requirements of the Clean Water Act, the Idaho water quality standards, and other appropriate water quality requirements of state law. (ACOE Permit Application Number: NWW-2018-00026)

Public Comment Form

Fields marked with * are required.

Staff Contacts

Senior Water Quality Analyst
Julia Achabal
DEQ Boise Regional Office
1445 N. Orchard St.
Boise, ID 83706
(208) 373-0550

Related Documents