Department of Environmental Quality HomeSearchFeedbackContact UsAccess Idaho
skip nav
About Us
Public Info & Input
Air
Water
Waste
INL Oversight
Maps & Data
Rules & Regs


Sign up for email updates Sign up
for E-mail Updates

Return to

DEQ's Coeur d'Alene Regional Office Web Page

Link to

Pend Oreille River and Tributaries TMDL Web Page New

Contact Us

Robert Steed

Surface Water Ecologist

DEQ Coeur d'Alene Regional Office

2110 Ironwood Parkway
Coeur d'Alene, ID 83814
ph: (208) 769-1422

fx: (208) 769-1404

 

Kristin Keith

Watershed Coordinator

DEQ Coeur d'Alene Regional Office

2110 Ironwood Parkway
Coeur d'Alene, ID 83814
ph: (208) 769-1422

fx: (208) 769-1404

 

 

About DEQ's Coeur d'Alene Region:

Pend Oreille River and Tributaries
(to Pend Oreille Lake and River)
Watershed Advisory Group (WAG)

Upcoming Meeting Dates
Background
 - Pend Oreille Tributaries
 - Pend Oreille Temperature Model
WAG Review Documents
 - Pend Oreille Tributary Working Group
 - Pend Oreille River Watershed Advisory Group
Previous Meeting Information
 - Pend Oreille Tributary Working Group Meetings
 - Pend Oreille River TMDL Watershed Advisory Group Meetings
 

Content on this page is provided for informational purposes while the Pend Oreille River and Tributaries Watershed Advisory Group (WAG) and DEQ work to develop a water quality improvement plan or "Total Maximum Daily Loads" (TMDLs) for water bodies in the watershed found to be not fully supporting beneficial uses.

Note: All of these documents are considered draft and are subject to change. The goal of providing these documents at WAG meetings and on this web page is to ensure citizens have the opportunity to provide input as the documents are developed.

 
 Upcoming Meeting Dates

Pend Oreille Tributary

Working Group Meeting

Pend Oreille River TMDL

Watershed Advisory Group Meeting

The public comment period for the

tributary TMDLs ended October 4,

2007. The TMDLs have also been

reviewed by the tributary working

group and have been sent tothe EPA for approval. No further meetings are scheduled at this time.

To Be Announced

 

 
 Background
 Pend Oreille Tributaries
> List of Pending TMDLs (pdf 39 kb, 2 pages)
> Gold Creek Stressor Identification (pdf 867 kb, 15 pages)
> Hellroaring Creek Stressor Identification (pdf 667 kb, 15 pages)
> McCormick Creek Stressor Identification (pdf 563 kb, 15 pages)
> Rapid Lightning Creek Stressor Identification (pdf 887 kb, 16 pages)
> Sand Creek Stressor Identification (pdf 779 kb, 14 pages)
> Upper Pack River Stressor Identification (pdf 539 kb, 16 pages)
 Pend Oreille River Temperature Model
> Pend Oreille River Final Modeling Report October 2007 (Lake Pend Oreille to Albeni Falls Dam) (pdf 1.2 mb, 64 pages)
> Pend Oreille River Final Modeling Report March 2007 (Lake Pend Oreille to Albeni Falls Dam) (pdf 1.3 mb, 58 pages)
> Water Quality Standards Analysis of the Pend Oreille River Model Results, Version 3 (pdf 70 kb, 13 pages)
>

Final Pend Oreille River Model Calibration Report (Lake Pend Oreille to Albeni Falls Dam) (pdf 17.3 mb, 168 pages)

Note: Due to the large size of this document, it may be difficult for some to download.  If you would like a CD mailed to you or have questions, contact Robert Steed at the Coeur d'Alene Regional Office, (208) 769-1422.

>

Revised Temperature Animations, October 2007

     Animation No. 1 (zip file, 2.5 mb, See downloading instructions below.)

     Animation No. 2 (zip file, 2.5 mb, See downloading instructions below.)

>

Vertical Profile and Longitudinal Temperature Animations, January 2007

(zip file, 2.8 mb - See downloading instructions below.)

>

Idaho Modeling Scenario Animations, March 2007

(zip file, 19.3 mb - See downloading instructions below.)

 
1. These animations were created using Tecplot software. In order to view these animations you will need to first install the Tecplot utility "Framer".
2. The framer utility has been developed by Tecplot and is free. Tecplot does not have a stand alone download link. The framer utility (Framer.exe) is included in the zip files above.
3. Once the framer utility has been installed, you can open the file and choose framer as the program to open it with.
4.

Tecplot Inc.

3535 Factoria Blvd. SE, Suite 550

Bellevue, WA  98006

Fax: (425) 653-9200

Web: www.tecplot.com

 
 WAG Review Documents
 Pend Oreille Tributary Working Group
> News Release on Request for Comment on Proposed Plans to Manage Pollution in Pend Oreille Lake Subbasin Water Bodies
> Proposed TMDLs
 Pend Oreille River Watershed Advisory Group
> Proposed Operating Procedures (pdf 22 kb, 2 pages)
>

Working Draft of the Pend Oreille River Temperature TMDL

(pdf 2.1 mb, 137 pages)

> Total Dissolved Gas TMDL:
 

Draft Pend Oreille River and Lake Total Dissolved Gas TMDL New

(pdf 2.0 mb, 110 pages)

> Responses to Comments to the Working Draft:
 
3/27/08

Army Corps of Engineers Response to WDOE Comments

(pdf 16 kb, 2 pages)

3/27/08

Army Corps of Engineers Response to DEQ Comments

(pdf 79 kb, 17 pages)

2/25/08

Washington Responses to Stakeholder Draft TMDL

Comments (pdf 24 kb, 6 pages)

2/25/08

Idaho Responses to Stakeholder Draft TMDL Comments

(pdf 41 kb, 8 pages)

> Comments to the Working Draft:
 
4/15/08

Seattle City Comments

(pdf 130 kb, 4 pages)

4/15/08

Seattle City Comments (Matrix)

(pdf 41 kb, 7 pages)

3/28/08

Army Corps of Engineers Comments

(pdf 45 kb, 9 pages)

12/13/07

Washington Department of Ecology Comments

(pdf 59 kb, 6 pages)

12/13/07

Heller Ehrman Comments

(pdf 242 kb, 6 pages)

11/21/07

Army Corps of Engineers Comments

(pdf 653 kb, 54 pages)

11/9/07

Army Corps of Engineers Comments

(pdf 317 kb, 36 pages)

10/19/07

Pend Oreille County Public Utility District Comments

(pdf 295 kb, 3 pages)

10/17/07 Ponderay Newsprint Comments (pdf 411 kb, 7 pages)
9/27/07 Seattle City Comments (pdf 78 kb, 17 pages)
9/13/07 City of Sandpoint Comments (pdf 96 kb, 2 pages)
9/12/07 Southside Water and Sewer Comment (pdf 119 kb, 2 pages)
6/20/07

Army Corps of Engineers Modeling Interpretation Comments

(pdf 17 kb, 3 pages)

6/01/07

Army Corps of Engineers Modeling Results Comments

(pdf 33 kb, 7 pages)

> Other Documents:
 
2/25/08

Idaho DEQ Staff Report on the October 2007 Pend Oreille River Model Report (pdf 24 kb, 6 pages)

2/25/08

An Approach to Using Load Duration Curves in the Development of TMDLs (pdf on U.S. EPA Web site)

 
 Previous Meeting Information
 Pend Oreille Tributary Working Group Meetings
Agendas
Presentations/Topics Covered
  October 16, 2007: Public comments received on the nutrient, temperature, and sediment TDMLs were shared and there was a request for a consensus to proceed with submission of the final TMDL for EPA approval.
  September 18, 2007: Topics covered were the release of the draft nutrient, temperature, and sediment TMDLs released to the public and the meeting was opened up to answer questions by the public.
July 19, 2007

Pack River Nutrient TMDL

(pdf 1.0 mb, 17 pages)

Tributary Work Group Comments on Draft Sediment TMDL Allocations (pdf 22 kb, 2 pages)

June 14, 2007

Sediment TMDL Allocations

(pdf 1.9 mb, 21 pages)

May 23, 2007

Idaho Temperature Water Quality Standards

(pdf 2.2 mb, 13 pages)

Regional Shade Curve Development (Peter Leinenbach, EPA)

(pdf 1.1 mb, 29 pages)

Draft Temperature TMDL Model and Results

(pdf 3.1 mb, 40 pages)

March 20, 2007

Pack River Nutrient TMDL Target Selection

(pdf 677 kb, 17 pages)

Sediment Model Revisions (pdf 1.0 mb, 28 pages)
February 13, 2007 Draft Sediment Model Results (pdf 3.6 mb, 22 pages)
Draft Pend Oreille Tributary TMDL Development Schedule (pdf 9 kb, 1 page)
October 26, 2006

Pack River Stressor Identification Process

(pdf 1.7 mb, 19 pages)

Sediment Model Overview (pdf 108 kb, 19 pages)
Tributary Overview and Beneficial Uses (pdf 2.9 mb, 23 pages)
 Pend Oreille River TMDL Watershed Advisory Group Meetings
Agendas
Meeting Summaries
June 17, 2008
May 12, 2008
April 28, 2008
February 25, 2008
October 25, 2007
September 28, 2007
August 16, 2007
June 25, 2007
May 10, 2007
March 20, 2007
January 25, 2007
October 26, 2006
May 25, 2006
October 20, 2005
 Presentations
> Washington Presentation Outline, February 2008 (pdf 19 kb, 4 pages)
>

Washington Response to Stakeholder Comments, February 2008

(pdf 740 kb, 18 pages)

> Idaho Compliance Areas, February 2008 (pdf 317 kb, 6 pages)
> Load Duration Curves, February 2008 (pdf 274 kb, 20 pages)
> Idaho Total Dissolved Gas TMDL, February 2008 (pdf 600 kb, 12 pages)
>

Pend Oreille River Temperature TMDL Allocations, October 2007

(pdf 385 kb, 25 pages)

>

Seattle District Army Corps of Engineers Comments, October 2007

(pdf 45 kb, 10 pages)

>

Ponderay Newsprint Co. Comments, October 2007 (pdf 165 kb, 20 pages)

>

Washington's TMDL Process, Where do we go from here? October 2007

(pdf 374 kb, 6 pages)

> Washington's Development of Tributary, Mainstem and NPDES Allocations, October 2007 (pdf 594 kb, 19 pages)
> Pend Oreille River Compliance with Idaho Standards - Lake Pend Oreille to WA/ID Border, June 2007 (pdf 667 kb, 30 pages)
> Overview of Washington and Kalispel Tribe Temperature Standards, June 2007 (pdf 236 kb, 20 pages)
> Pend Oreille River Compliance with Washington and Kalispel Tribe Standards - Box Canyon Reach, June 2007 (pdf 562 kb, 27 pages)
> Pend Oreille River Compliance with Washington Standards - Boundary Dam Reach, June 2007 (pdf 516 kb, 24 pages)
> Pend Oreille River TMDL Schedule, May 2007 (pdf 12 kb, 1 page)
> Summary of Idaho Modeling Results, May 2007 (pdf 1.2 mb, 13 pages)
>

Preliminary Box Canyon Segment Modeling Results, May 2007

(pdf 626 kb, 46 pages)

>

Preliminary Boundary Segment Modeling Results, May 2007 (pdf 462 kb, 28 pages)

> Overview of Temperature and TDG, March 2007 (pdf 255 kb, 8 pages)
> Draft Pend Oreille River Temperature Model Results (Lake Pend Oreille to Albeni Falls Dam), March 2007 (by Portland State University) (pdf 555 kb, 24 pages)
> Discussion of Model Error, March 2007 (pdf 488 kb, 12 pages)
> Pend Oreille River Temperature TMDL Strategy and Call for Data, March 2007 (pdf 187 kb, 11 pages)
> Corps of Engineers Pend Oreille Research Summary (pdf 1.5 mb, 15 pages)
>

Pend Oreille River - Idaho and Box Canyon Reaches Hydrodynamic Model,

January 2007 (by Portland State University) (pdf 3.5 mb, 42 pages)

>

Temperature Modeling of the Pend Oreille River, Model Calibration, Boundary Dam Reach, January 2007 (pdf 6.4 mb, 38 pages)

>

Overview of Next Steps, January 2007 (pdf 2.1 mb, 20 pages)

>

Boundary Reservoir, Surface Layer Longitudinal Temperature Variation,

January 2007

(avi 42 mb, requires media player and will take several minutes to download)

> Idaho Beneficial Uses (pdf 600 kb, 10 pages)
> Operating Procedures Overview (pdf 221 kb, 13 pages)
> Temperature Modeling 101 (pdf 2.1 mb, 38 pages)
 
Washington Department of Ecology Pend Oreille River TMDL Web Page
 



  Home | Search | Contact Us |Feedback | About PDF Files | Acronyms | Glossary | State of Idaho | Privacy Notice  
  Copyright © 2000-2008, Idaho Department of Environmental Quality. All rights reserved.