








 |
Sign up
for E-mail Updates |
Return to
DEQ's Coeur d'Alene Regional Office Web Page
Link to
Pend Oreille River and Tributaries TMDL Web Page New
Contact Us
Robert Steed
Surface Water Ecologist
DEQ Coeur d'Alene Regional
Office
2110 Ironwood Parkway
Coeur d'Alene, ID 83814
ph: (208) 769-1422
fx: (208) 769-1404
Kristin Keith
Watershed Coordinator
DEQ Coeur d'Alene Regional Office
2110 Ironwood Parkway
Coeur d'Alene, ID 83814
ph: (208) 769-1422
fx: (208) 769-1404
|
 |
About DEQ's Coeur d'Alene Region:
Pend Oreille River and Tributaries
(to Pend Oreille Lake and River)
Watershed Advisory Group (WAG)
|
| |
| Content
on this page is provided for informational purposes while the Pend Oreille River and Tributaries Watershed Advisory Group (WAG) and DEQ
work to develop a water quality improvement plan or "Total
Maximum Daily Loads" (TMDLs) for water bodies in the watershed
found to be not fully supporting beneficial uses.
Note:
All of these documents are considered draft
and are subject to change. The goal of providing these documents
at WAG meetings and on this web page is to ensure citizens have
the opportunity to provide input as the documents are developed.
|
| |
| Upcoming Meeting Dates |
Pend Oreille Tributary
Working Group Meeting |
Pend Oreille River TMDL
Watershed Advisory Group Meeting |
The public comment period for the
tributary TMDLs ended October 4,
2007. The TMDLs have also been
reviewed by the tributary working
group and have been sent tothe EPA for approval. No further meetings are scheduled at this time.
|
To Be Announced
|
|
| |
| Background |
| Pend Oreille Tributaries |
|
| Pend Oreille River Temperature Model |
| > |
Pend Oreille River Final Modeling Report October 2007 (Lake Pend Oreille to Albeni Falls Dam) (pdf 1.2 mb, 64 pages) |
| > |
Pend Oreille River Final Modeling Report March 2007 (Lake Pend Oreille to Albeni Falls Dam) (pdf 1.3 mb, 58 pages) |
| > |
Water Quality Standards Analysis of the Pend Oreille River Model Results, Version 3 (pdf 70 kb, 13 pages) |
| > |
Final Pend Oreille River Model Calibration Report (Lake Pend Oreille to Albeni Falls Dam) (pdf 17.3 mb, 168 pages)
Note: Due to the large size of this document, it may be difficult for some to download. If you would like a CD mailed to you or have questions, contact Robert Steed at the Coeur d'Alene Regional Office, (208) 769-1422.
|
| > |
Revised Temperature Animations, October 2007
Animation No. 1 (zip file, 2.5 mb, See downloading instructions below.)
Animation No. 2 (zip file, 2.5 mb, See downloading instructions below.) |
| > |
Vertical Profile and Longitudinal Temperature Animations, January 2007
(zip file, 2.8 mb - See downloading instructions below.) |
| > |
Idaho Modeling Scenario Animations, March 2007
(zip file, 19.3 mb - See downloading instructions below.) |
| |
| 1. |
These animations were created using Tecplot software. In order to view these animations you will need to first install the Tecplot utility "Framer". |
| 2. |
The framer utility has been developed by Tecplot and is free. Tecplot does not have a stand alone download link. The framer utility (Framer.exe) is included in the zip files above. |
| 3. |
Once the framer utility has been installed, you can open the file and choose framer as the program to open it with. |
| 4. |
Tecplot Inc.
3535 Factoria Blvd. SE, Suite 550
Bellevue, WA 98006
Fax: (425) 653-9200
Web: www.tecplot.com |
|
|
| |
| WAG Review Documents |
| Pend Oreille Tributary Working Group |
|
| Pend Oreille River Watershed Advisory Group |
| > |
Proposed Operating Procedures (pdf 22 kb, 2 pages) |
| > |
Working Draft of the Pend Oreille River Temperature TMDL
(pdf 2.1 mb, 137 pages) |
| > |
Total Dissolved Gas TMDL: |
| |
|
| > |
Responses to Comments to the Working Draft: |
| |
|
| > |
Comments to the Working Draft: |
| |
| 4/15/08 |
Seattle City Comments
(pdf 130 kb, 4 pages) |
| 4/15/08 |
Seattle City Comments (Matrix)
(pdf 41 kb, 7 pages) |
| 3/28/08 |
Army Corps of Engineers Comments
(pdf 45 kb, 9 pages) |
| 12/13/07 |
Washington Department of Ecology Comments
(pdf 59 kb, 6 pages) |
| 12/13/07 |
Heller Ehrman Comments
(pdf 242 kb, 6 pages) |
| 11/21/07 |
Army Corps of Engineers Comments
(pdf 653 kb, 54 pages) |
| 11/9/07 |
Army Corps of Engineers Comments
(pdf 317 kb, 36 pages) |
| 10/19/07 |
Pend Oreille County Public Utility District Comments
(pdf 295 kb, 3 pages) |
| 10/17/07 |
Ponderay Newsprint Comments (pdf 411 kb, 7 pages) |
| 9/27/07 |
Seattle City Comments (pdf 78 kb, 17 pages) |
| 9/13/07 |
City of Sandpoint Comments (pdf 96 kb, 2 pages) |
| 9/12/07 |
Southside Water and Sewer Comment (pdf 119 kb, 2 pages) |
| 6/20/07 |
Army Corps of Engineers Modeling Interpretation Comments
(pdf 17 kb, 3 pages) |
| 6/01/07 |
Army Corps of Engineers Modeling Results Comments
(pdf 33 kb, 7 pages) |
|
| > |
Other Documents: |
| |
|
|
| |
| Previous Meeting Information |
| Pend Oreille Tributary Working Group Meetings |
|
Agendas |
Presentations/Topics Covered |
| |
October 16, 2007: Public comments received on the nutrient, temperature, and sediment TDMLs were shared and there was a request for a consensus to proceed with submission of the final TMDL for EPA approval. |
| |
September 18, 2007: Topics covered were the release of the draft nutrient, temperature, and sediment TMDLs released to the public and the meeting was opened up to answer questions by the public. |
| July 19, 2007 |
Pack River Nutrient TMDL
(pdf 1.0 mb, 17 pages)
Tributary Work Group Comments on Draft Sediment TMDL Allocations (pdf 22 kb, 2 pages)
|
| June 14, 2007 |
Sediment TMDL Allocations
(pdf 1.9 mb, 21 pages) |
| May 23, 2007 |
Idaho Temperature Water Quality Standards
(pdf 2.2 mb, 13 pages) |
Regional Shade Curve Development (Peter Leinenbach, EPA)
(pdf 1.1 mb, 29 pages) |
Draft Temperature TMDL Model and Results
(pdf 3.1 mb, 40 pages) |
| March 20, 2007 |
Pack River Nutrient TMDL Target Selection
(pdf 677 kb, 17 pages) |
| Sediment Model Revisions (pdf 1.0 mb, 28 pages) |
| February 13, 2007 |
Draft Sediment Model Results (pdf 3.6 mb, 22 pages) |
| Draft Pend Oreille Tributary TMDL Development Schedule (pdf 9 kb, 1 page) |
| October 26, 2006 |
Pack River Stressor Identification Process
(pdf 1.7 mb, 19 pages) |
| Sediment Model Overview (pdf 108 kb, 19 pages) |
| Tributary Overview and Beneficial Uses (pdf 2.9 mb, 23 pages) |
|
| Pend Oreille River TMDL Watershed Advisory Group Meetings |
Agendas |
Meeting Summaries |
| June 17, 2008 |
|
| May 12, 2008 |
|
| April 28, 2008 |
|
| February 25, 2008 |
|
| October 25, 2007 |
|
| September 28, 2007 |
|
| August 16, 2007 |
|
| June 25, 2007 |
|
| May 10, 2007 |
|
| March 20, 2007 |
|
| January 25, 2007 |
|
| October 26, 2006 |
|
| May 25, 2006 |
|
| October 20, 2005 |
|
|
| Presentations |
| > |
Washington Presentation Outline, February 2008 (pdf 19 kb, 4 pages) |
| > |
Washington Response to Stakeholder Comments, February 2008
(pdf 740 kb, 18 pages) |
| > |
Idaho Compliance Areas, February 2008 (pdf 317 kb, 6 pages) |
| > |
Load Duration Curves, February 2008 (pdf 274 kb, 20 pages) |
| > |
Idaho Total Dissolved Gas TMDL, February 2008 (pdf 600 kb, 12 pages) |
| > |
Pend Oreille River Temperature TMDL Allocations, October 2007
(pdf 385 kb, 25 pages) |
| > |
Seattle District Army Corps of Engineers Comments, October 2007
(pdf 45 kb, 10 pages) |
| > |
Ponderay Newsprint Co. Comments, October 2007 (pdf 165 kb, 20 pages)
|
| > |
Washington's TMDL Process, Where do we go from here? October 2007
(pdf 374 kb, 6 pages) |
| > |
Washington's Development of Tributary, Mainstem and NPDES Allocations, October 2007 (pdf 594 kb, 19 pages) |
| > |
Pend Oreille River Compliance with Idaho Standards - Lake Pend Oreille to WA/ID Border, June 2007 (pdf 667 kb, 30 pages) |
| > |
Overview of Washington and Kalispel Tribe Temperature Standards, June 2007 (pdf 236 kb, 20 pages) |
| > |
Pend Oreille River Compliance with Washington and Kalispel Tribe Standards - Box Canyon Reach, June 2007 (pdf 562 kb, 27 pages) |
| > |
Pend Oreille River Compliance with Washington Standards - Boundary Dam Reach, June 2007 (pdf 516 kb, 24 pages) |
| > |
Pend Oreille River TMDL Schedule, May 2007 (pdf 12 kb, 1 page) |
| > |
Summary of Idaho Modeling Results, May 2007 (pdf 1.2 mb, 13 pages) |
| > |
Preliminary Box Canyon Segment Modeling Results, May 2007
(pdf 626 kb, 46 pages) |
| > |
Preliminary Boundary Segment Modeling Results, May 2007 (pdf 462 kb, 28 pages)
|
| > |
Overview of Temperature and TDG, March 2007 (pdf 255 kb, 8 pages) |
| > |
Draft Pend Oreille River Temperature Model Results (Lake Pend Oreille to Albeni Falls Dam), March 2007 (by Portland State University) (pdf 555 kb, 24 pages) |
| > |
Discussion of Model Error, March 2007 (pdf 488 kb, 12 pages) |
| > |
Pend Oreille River Temperature TMDL Strategy and Call for Data, March 2007 (pdf 187 kb, 11 pages) |
| > |
Corps of Engineers Pend Oreille Research Summary (pdf 1.5 mb, 15 pages) |
| > |
Pend Oreille River - Idaho and Box Canyon Reaches Hydrodynamic Model,
January 2007 (by Portland State University) (pdf 3.5 mb, 42 pages)
|
| > |
Temperature Modeling of the Pend Oreille River, Model Calibration, Boundary Dam Reach, January 2007 (pdf 6.4 mb, 38 pages)
|
| > |
Overview of Next Steps, January 2007 (pdf 2.1 mb, 20 pages)
|
| > |
Boundary Reservoir, Surface Layer Longitudinal Temperature Variation,
January 2007
(avi 42 mb, requires media player and will take several minutes to download) |
| > |
Idaho Beneficial Uses (pdf 600 kb, 10 pages) |
| > |
Operating Procedures Overview (pdf 221 kb, 13 pages) |
| > |
Temperature Modeling 101 (pdf 2.1 mb, 38 pages) |
|
| |
| Washington Department of Ecology Pend Oreille River TMDL Web Page |
| |
|
 |